Alva Booster Pump Work in Progress

 

April 19, 2020

Marione Martin

Ongoing construction on the west side of Alva includes the installation of a new water booster pump at 14th and Oklahoma Boulevard.

Ongoing construction on the west side of Alva includes the installation of a new water booster pump at 14th and Oklahoma Boulevard. The tower will be drained of stagnant water and cleaned so it can again be used for water storage. The work will be paid for through a federal low interest loan....



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024