Airport pushes ahead on turf runway project

 

November 16, 2016



The Alva Airport Board decided Monday night that they want to make a priority of rebuilding the east-west turf runway. The runway was accidentally left out of the drawing when the new longer runway was submitted for FFA approval by the architect.

The problem vexing the airport board is if this grass runway is “engineered,” and goes through all the bureaucratic steps, the cost will be over $300,000. Board member Terry Turner commented, “I think it is unconscionable for a grass runway we initially built ourselves to cost that much. Yet, I think we must have it because there is no other east-west...



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Our Family of Publications Includes:

Arc
Newsgram

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024